- Installed all needed software on a MSI Wind netbook
- Cleaned and tested the fibreglas telescope tower
- Checked the cables etc.
- Run some test QSOs with my TS 570 DG in SSB, PSK31 and CW
Sonntag, 26. Juli 2009
Preparation is ongoing
I used the weekend to prepare the equipment:
Abonnieren
Kommentare zum Post (Atom)
Keine Kommentare:
Kommentar veröffentlichen